中文 English
Location:Tech Support

The diesel engine of the new assembly must go through a period of running

DATE:2019/6/24 12:11:45 HITS:861

1, hot run-in;

Under no load conditions should be running, the running speed of the diesel generator can be controlled in less than 1300r/min, the technical indicators in line with the requirements of no-load run-in period, and then load thermal run-in. This time about 60h, diesel generator set operation can also be a case-by-case basis. In the process of load increase, to have a load Ascending process of gradually increasing until the engine reaches the run-in period of the heat carrying normal standards.

2, cold run-in;

Diesel generators can not start, batteries or artificial leveraging diesel generator flywheel the engine running. Lubricating oil sump diesel generator should all put the net in the cold after running, and cleaning with cleaning oil.

3, the Chai Shan machine in hot running-in process, the temperature of the lubricating oil to be controlled within the range of 651C-75 ° C, the temperature of the cooling water should be controlled within the range of 70 ° C-80 ° C.

工作时间

早9:00 - 晚18:00

周六日休息

+86 13509009815