① will be attached to the the unit traces of water, traces of oil and iron embroidered debris cleaned.
②Nut units each device is fully inspected again, check the connection, fastening and manipulate parts have been attached securely and properly, string through shock absorbers (ie fastening bolts through the foot cushioning and chassis) may not be overtighten (ie, the nut is screwed to the bottom of the foot are new to the position until the two nuts must be interlocked to prevent loose), otherwise it would shock absorber failure.
③ Check the fuel tank, fuel storage capacity to meet the needs.
④ check the adequacy of diesel engine oil pan and fuel pump, governor, the amount of oil.
⑤ to the tank (radiator) filled with cooled permanent.
⑥ Check all electrical parts, each contact should be firm and correct, automatic air switch in the "off" position, check battery can work and attention to start the system generally negative ground.
⑦ crew intermittent period of time and then run, you must first 500V megger measuring each winding of the generator and control system, the insulation resistance of the ground, the room temperature should not be less than 2 megohms insulation resistance is less than the above values, must be drying process.